Difference between revisions of "Microscope Installation Pictures"

From UConn PAN
Jump to navigation Jump to search
Line 8: Line 8:
 
tagm-install-9-2014-6.jpg
 
tagm-install-9-2014-6.jpg
 
</gallery>
 
</gallery>
[[file:tagm-install-9-2014-7.jpg]]
 

Revision as of 16:18, 7 July 2016

The tagger microscope was assembled in the Experimental Staging Building (ESB, building 23) at Jefferson Lab during September, 2014. Below are pictures of the assembly process as well as moving the microscope into the hall.