Difference between revisions of "Construction Phase"

From UConn PAN
Jump to navigation Jump to search
Line 6: Line 6:
 
== Fiber Cutting ==
 
== Fiber Cutting ==
  
'''
 
 
** [http://zeus.phys.uconn.edu/~mcintyre/workfiles/Drawings/Large-Bundle-Collar_piece2.dwg '''5x6 Bundle Collar (Top Half)- AutoCAD Format''']
 
** [http://zeus.phys.uconn.edu/~mcintyre/workfiles/Drawings/Large-Bundle-Collar_piece2.dwg '''5x6 Bundle Collar (Top Half)- AutoCAD Format''']
 
** [http://zeus.phys.uconn.edu/~mcintyre/workfiles/Drawings/Large-Bundle-Collar_piece1.dwg '''5x6 Bundle Collar (Bottom Half)- AutoCAD Format''']
 
** [http://zeus.phys.uconn.edu/~mcintyre/workfiles/Drawings/Large-Bundle-Collar_piece1.dwg '''5x6 Bundle Collar (Bottom Half)- AutoCAD Format''']

Revision as of 02:11, 15 March 2012

Construction Phase for the Full Scale Tagger Microscope

Fiber Cutting

Splicing Unit

   Splicing Collar Drawings (as of 26 Feb 2012)
  • Drawings


Fiber Bending Units

   TBD 
  • Straightening Unit
    • Design in Progress

Painting Setup

Bundle Gluing

Bundle Support Gluing

Quality Assurance