Difference between revisions of "Construction Phase"

From UConn PAN
Jump to navigation Jump to search
Line 5: Line 5:
  
 
== Fiber Cutting ==
 
== Fiber Cutting ==
 
+
'''Bundle Collar Drawings''' (as of 14 Mar 2012)
 
* [http://zeus.phys.uconn.edu/~mcintyre/workfiles/Drawings/Large-Bundle-Collar_piece2.dwg '''5x6 Bundle Collar (Top Half)- AutoCAD Format''']
 
* [http://zeus.phys.uconn.edu/~mcintyre/workfiles/Drawings/Large-Bundle-Collar_piece2.dwg '''5x6 Bundle Collar (Top Half)- AutoCAD Format''']
 
** [http://zeus.phys.uconn.edu/~mcintyre/workfiles/Drawings/Large-Bundle-Collar_piece2.tcw '''5x6 Bundle Collar (Top Half)- TurboCAD Format''']
 
** [http://zeus.phys.uconn.edu/~mcintyre/workfiles/Drawings/Large-Bundle-Collar_piece2.tcw '''5x6 Bundle Collar (Top Half)- TurboCAD Format''']

Revision as of 02:24, 15 March 2012

Construction Phase for the Full Scale Tagger Microscope

Fiber Cutting

Bundle Collar Drawings (as of 14 Mar 2012)

Splicing Unit

   Splicing Collar Drawings (as of 26 Feb 2012)

Drawings

Fiber Bending Units

   TBD 
  • Straightening Unit
    • Design in Progress

Painting Setup

Bundle Gluing

Bundle Support Gluing

Quality Assurance