Difference between revisions of "Construction Phase"

From UConn PAN
Jump to navigation Jump to search
Line 33: Line 33:
 
** [http://zeus.phys.uconn.edu/~mcintyre/workfiles/Drawings/Heat-Treating-Unit.mp4 '''Bending Unit - MP4 Movie''']
 
** [http://zeus.phys.uconn.edu/~mcintyre/workfiles/Drawings/Heat-Treating-Unit.mp4 '''Bending Unit - MP4 Movie''']
 
** [http://zeus.phys.uconn.edu/~mcintyre/workfiles/Drawings/Heat-Treating-Fibers.pptx '''Bending Unit - Power Point''']
 
** [http://zeus.phys.uconn.edu/~mcintyre/workfiles/Drawings/Heat-Treating-Fibers.pptx '''Bending Unit - Power Point''']
 +
 +
* ''Heating Unit Controls (Labview)''
  
 
== Painting Setup ==
 
== Painting Setup ==

Revision as of 18:51, 5 April 2012

Construction Phase for the Full Scale Tagger Microscope

Fiber Cutting

   Bundle Collar Drawings (as of 14 Mar 2012)

Splicing Unit

   Splicing Collar Drawings (as of 26 Feb 2012)

Drawings

Fiber Bending Units

   TBD 
  • Straightening Unit
    • Design in Progress
  • Heating Unit Controls (Labview)

Painting Setup

Bundle Gluing

Bundle Support Gluing

Quality Assurance

Material List

Material List