Difference between revisions of "BW January 2014"
Line 3: | Line 3: | ||
On January 6, Liana and I emptied and dried the fish tank, washed it with warm water, and dried it again. We polished light guides. It took me much longer than it took her. I might have been pressing too hard. I measured the length and width of 30 scintillating fibers. I counted scintillating fibers and put them in relabeled bags. | On January 6, Liana and I emptied and dried the fish tank, washed it with warm water, and dried it again. We polished light guides. It took me much longer than it took her. I might have been pressing too hard. I measured the length and width of 30 scintillating fibers. I counted scintillating fibers and put them in relabeled bags. | ||
− | On January 7, I learned how to screw the collars onto the Unistrut | + | On January 7, I learned how to screw the collars onto the Unistrut bar. I scraped rust off the bar with a damp cloth. Kenny and I made two bundles of fibers for Brendan to mill. The collars have to be 65 10/16" apart on the outside. |
Revision as of 18:29, 7 January 2014
On January 2, I helped straighten a bundle after cleaning a bundle that had already been straightened. Then I revised an old version of the straightening procedure and typed two other procedures.
On January 6, Liana and I emptied and dried the fish tank, washed it with warm water, and dried it again. We polished light guides. It took me much longer than it took her. I might have been pressing too hard. I measured the length and width of 30 scintillating fibers. I counted scintillating fibers and put them in relabeled bags.
On January 7, I learned how to screw the collars onto the Unistrut bar. I scraped rust off the bar with a damp cloth. Kenny and I made two bundles of fibers for Brendan to mill. The collars have to be 65 10/16" apart on the outside.