(Created page with "The active collimator has been installed in the collimator cave in Hall D. A shielding box was constructed out of plexi and placed above the active collimator. <gallery perro...") |
|||
Line 1: | Line 1: | ||
+ | ==Active Collimator== | ||
+ | The active collimator has been delivered to JLab by John Bartolotta. As of July 1, 2014 Alex Barnes is in charge of the assembly, testing, installation and analysis of the active collimator. | ||
+ | |||
+ | ==Assembly== | ||
+ | Below are pictures of the assembling process | ||
+ | <gallery perrow=6> | ||
+ | image:collimator_machined_screw.jpg|A machined screw for the RF connector. | ||
+ | image:active_collimator_01.jpg|The back of the active collimator with only 4 installed wedges. | ||
+ | image:active_collimator_02.jpg|This is another view of the back of the active collimator with only 4 wedges installed. | ||
+ | image:active_collimator_03.jpg|The active collimator with only 4 wedges installed. This was taken on the bench at JLab. | ||
+ | image:active_collimator_04.jpg|The spare wedges provided by FSU. | ||
+ | image:active_collimator_05.jpg|The fifth wedge has been installed. | ||
+ | image:active_collimator_06.jpg|Closer shot of the fifth wedge. Notice how the wedge covers the hole slightly. This was noticed and fixed during the assembly process. | ||
+ | image:active_collimator_07.jpg|The sixth wedge has been installed in the active collimator. | ||
+ | image:active_collimator_08.jpg|The inner wedges have been adjusted to prevent blockage of the central hole. | ||
+ | image:active_collimator_09.jpg|The seventh wedge of the collimator has been installed. | ||
+ | image:active_collimator_10.jpg|All wedges have been installed in the active collimator. | ||
+ | image:active_collimator_11.jpg|A closer view of all eight wedges of the active collimator. | ||
+ | </gallery> | ||
+ | |||
+ | ==Installation== | ||
The active collimator has been installed in the collimator cave in Hall D. A shielding box was constructed out of plexi and placed above the active collimator. | The active collimator has been installed in the collimator cave in Hall D. A shielding box was constructed out of plexi and placed above the active collimator. | ||
Revision as of 19:57, 23 October 2014
Active Collimator
The active collimator has been delivered to JLab by John Bartolotta. As of July 1, 2014 Alex Barnes is in charge of the assembly, testing, installation and analysis of the active collimator.
Assembly
Below are pictures of the assembling process
Installation
The active collimator has been installed in the collimator cave in Hall D. A shielding box was constructed out of plexi and placed above the active collimator.