Active Collimator Installation Pictures

From UConn PAN
Revision as of 19:57, 23 October 2014 by Barnes (talk | contribs)
Jump to navigation Jump to search

Active Collimator

The active collimator has been delivered to JLab by John Bartolotta. As of July 1, 2014 Alex Barnes is in charge of the assembly, testing, installation and analysis of the active collimator.

Assembly

Below are pictures of the assembling process

Installation

The active collimator has been installed in the collimator cave in Hall D. A shielding box was constructed out of plexi and placed above the active collimator.