Microscope Installation Pictures

From UConn PAN
Revision as of 16:08, 7 July 2016 by Jonesrt (talk | contribs)
Jump to navigation Jump to search

The tagger microscope was assembled in the Experimental Staging Building (ESB, building 23) at Jefferson Lab during September, 2014. Below are pictures of the assembly process as well as moving the microscope into the hall.

Tagm-install-9-2014-1.jpg